Upgrade and streamline operation of the HVAC systems within the church complex in order to make overall energy usage more efficient and maintenance more manageable. Mitigate the risk of one antiquated boiler being a potential single point of failure for most of the heating throughout the facility by creating a zoned approach splitting the boiler workload between two boiler units.
Upgrade and modernize elevator to ensure fire and safety codes are met and the safety of our parishioners is maintained at the highest possible level.